Bioenergy · Record 388
Germany’s largest integrated bio-LNG plant according to EnviTec in 2023
About 9,600 t bio-LNG/year at full load
- Date
- 2023
- Place
- Güstrow, Germany
- Holder or entity
- BioEnergie Park Güstrow
- Type
- Historical operator claim
- Evidence
- Producer and operator statements
- Country
- 🇩🇪 Germany
About this record
The annual report confirms regular operations began in 2023. The complex combines biogas production, upgrading and liquefaction, using feedstocks including poultry manure.
Scope and limits
The historical operator claim includes CO₂ liquefaction. Full-load capacity is not actual annual output.
Sources
- S432 Annual Report 2023, pp. 8, 14 and 22: BioEnergie Park Güstrow EnviTec Biogas · envitec-biogas.com
Sources read on 22 November 2026 for edition PRO 11.0. The original source takes precedence when you check the data.
Cite this record
Husfarm, Agricultural records compendium PRO 11.0, record 388: Germany’s largest integrated bio-LNG plant according to EnviTec in 2023. EnviTec Biogas: Annual Report 2023, pp. 8, 14 and 22: BioEnergie Park Güstrow. https://husfarm.com/agricultural-records/bioenergy/germanys-largest-integrated-bio-lng-plant-according-to-envitec-in-2023/ (accessed 22 November 2026).

